Catalog·FEMA·FEMA Public Assistance — Federal Obligation
Hillsborough County, Florida · as of 2025-12-31

FEMA Public Assistance — Federal Obligation

FEMA Public Assistance Obligation (annual federal $)
View on FEMA ↗
$0.00
yoy
▼ 100.00%
vs Florida
◂ 0.0pp
vs United States
▼ 17.0pp
16 obs · annual · dollars
Hillsborough County, FloridaFloridaUnited States
What it is

Public Assistance is the federal money that rebuilds county infrastructure after a declared disaster — roads, water systems, parks, schools, public buildings. When Hillsborough's PA obligation spikes in a disaster year, that's infrastructure spend that raises the floor under long-term property values and says something quantitative about how bad the damage actually was. Watch the shape against FL + US: Florida's PA cycle dominates US totals in hurricane years.

source
FEMA
frequency
annual
units
dollars
geo
Hillsborough County, Florida

Note: featured_geo_code is unpadded ('57', not '057') per decision #110 — live testing confirmed '057' returns 0 rows. Year resolves via the row's `declarationDate` (not `firstObligationDate`) — obligations can stretch years past the declaration, but attributing to declaration year keeps the narrative aligned with the hurricane that caused the work.

What it’s telling us · as of 2025-12-31

Hillsborough drew zero dollars in new Public Assistance obligations this year, a stark drop from $151.8M obligated in 2024 — that swing reflects the absence of a major disaster declaration, not a shift in county exposure. For context, the US absorbed $1.86B in PA obligations this year; Florida matched Hillsborough's zero, meaning no federally declared disasters hit the state in 2025. The real signal lives in the recent pattern: 2024's spike came from Hurricane Milton and other declared events, while 2020-2023 show infrastructure work stretching across multiple years after major storms. If your property is underwritten on the assumption that a named hurricane hits every few years, that's where to calibrate — when a disaster does declare, watch the obligation timeline, because federal infrastructure rebuild typically lags the storm by 6-24 months and can reshape local property values and insurance-pool dynamics during that window.

⟡ auto-generated weekly · claude-haiku-4-5 · reviewed before publish
Get the data
Python · FEMA
"""
FEMA Public Assistance — Federal Obligation to Hillsborough County, Florida (annual sum).
NOTE: PA countyCode is unpadded ('57', not '057' — decision #110) and state field is `stateAbbreviation`.
"""
import requests
from collections import defaultdict

url = "https://www.fema.gov/api/open/v2/PublicAssistanceFundedProjectsDetails"
base = {
    "$filter": "stateAbbreviation eq 'FL' and countyCode eq '57' and declarationDate ge '2010-01-01T00:00:00.000Z'",
    "$top": 10000,
}
rows, skip = [], 0
while True:
    batch = requests.get(url, params={**base, "$skip": skip}, timeout=60).json()["PublicAssistanceFundedProjectsDetails"]
    rows += batch
    if len(batch) < 10000: break
    skip += 10000
per_year = defaultdict(float)
for r in rows:
    yr = int(r["declarationDate"][:4])
    per_year[yr] += (r.get("federalShareObligated") or 0)
for year, amount in sorted(per_year.items()):
    print(f"{year}: ${amount:,.0f} PA federal obligated")
LLM prompt
You are analyzing FEMA dataset fema_pa_federal_obligation_county — FEMA Public Assistance Obligation (annual federal $).

Context: Public Assistance is the federal money that rebuilds county infrastructure after a declared disaster — roads, water systems, parks, schools, public buildings. When Hillsborough's PA obligation spikes in a disaster year, that's infrastructure spend that raises the floor under long-term property values and says something quantitative about how bad the damage actually was. Watch the shape against FL + US: Florida's PA cycle dominates US totals in hurricane years.


Attributes
- Units: dollars
- Frequency: annual
- Source: FEMA · Hillsborough County, Florida

Latest observation: $0.00 as of 2025-12-31
Year-over-year change: -100.00%

Analyze this metric for a tech-forward real estate investor with 1–3 properties. What is it signaling right now? What should I watch next?
as of DEC 31 · 2025 · pulled NOV 14 · 18:28ZFEMA ↗